Assembly Group BG49 F100-1/2"



Application
An Assembly Group containing components to make up a permanent pipe connection with the insulated Chilled Water Clamp RB for chiller plants and cool water systems. The Assembly Group is designed for use with the Beam Section TP F 100. It is connected using Self Forming Screw FLS F, and the height is adjusted via the Threaded Tube 1/2".
Scope of delivery
Each Assembly Group is pre-assembled, packed and labeled.
Parts list:
Item 1 Chilled Water Clamp RB
Assembly Kit MKit F 100 1/2" consists of:
Item 2 Threaded Tube GR 1/2" x 200
Item 3 Locking Nut NT G 1/2"
Item 4 Mounting Plate GPL F 100-1/2"
Item 5 Self Forming Screw FLS F
Installation
The assembly of the individual components to form an Assembly Group is carried out during the course of pipe installation on the construction site.
Technical Data
Lmax, vertical = 200 mm
Lmax, horizontal = 150 mm
Material: | |
Assembly parts: | Steel, HCP |
Bolts and nuts: | Steel, HCP |
Insulating body: | PUR foam (250 kg/m3 , B2) µ = 1200, λ = 0,045 W/mK (0°C) |
Area of use: | -50°C to +105°C |